Sint Sebastiaan Bridge

The Sint Sebastiaansbrug (Saint Sebastian Bridge) over the Rhine-Schie canal is the main link between the old city center and the southern part of Delft.

The total span is approximately 165 m, with a movable section. The bridge is in poor condition and needs replacement also to allow a new tram line to cross over. The new tram line (n.19) will connect the train station to the campus of TU Delft. This means the bridge will need to be wider and increase its structural strength.

In addition, the Province of South Holland, the bridge manager, asked to reduce the number of openings by increasing the vertical clearance of 1m.

The project consist of prefab concrete elements and a movable steel section. The new opening system (a “table bridge”) lifts up the steel section by 1m with four hydraulic pistons. Part of the project is the redevelopment of the banks to allow new functions to settle and live up the areas.

I worked as part of the team on the initial proposal studying alternative cross sections and cladding solutions. I worked on 2D and 3D drawings and on finalizing the visualizations.
This project is made in collaboration with Royal HaskoningDHV and Movares.

Developed as part of a small team while working at Zwarts & Jansma Architects in Amsterdam, the Netherlands.

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s